Check Lists:Project Management/Test: Difference between revisions

From PMISwiki
Jump to navigation Jump to search
(Created page with "==Test== Below you will find check-lists for preparation of Test documentation. ===Test Plan=== * What will be tested. * What requirements will be verified (Reference to Requir...")
 
 
Line 49: Line 49:
|}
|}


[[Category:software development]]
[[Category:Software development]]
[[Category:HTML5]]
[[Category:Project management]]
[[Category:Dojo]]
[[Category:Test]]
[[Category:dojo.addOnLoad]]
[[Category:Dojox]]
[[Category:Dijit]]
[[Category:dijit.form]]

Latest revision as of 15:59, 17 March 2012

Test

Below you will find check-lists for preparation of Test documentation.

Test Plan

  • What will be tested.
  • What requirements will be verified (Reference to Requirement specification or even better to the Requirement traceability matrix).
  • Definition of Measurement methods or Standards.
  • Entry criteria for each test.
  • Definition of acceptance criteria (Test item level and globally).
  • The customer's participation.
  • Consequences if test in question is approved/not approved.

Test Procedure

  • Test prerequisites
  • Step by step script
  • Accept criteria

Test Report

  • List of participants (Check-in/Check-out)
  • Documentation of executed tests and their results (Failed/Passed).

Milestone Acceptance Criteria

It is very important that the Accept Criteria are described and agreed in good time before the milestone.

  • References to named tests.
  • Other prerequisites.

References

Document History

Version Date Author Status Purpose of update
1 17 Mar 2012 PSA Draft Not released.