Check Lists:Project Management/Project documentation: Difference between revisions

From PMISwiki
Jump to navigation Jump to search
(Created page with "All project needs a project folder (physical of electronic) the contents of the documentation may vary depending on the nature of the project. The check list below contains a lis...")
 
No edit summary
 
Line 9: Line 9:
** List of equipment for calibration (if any)
** List of equipment for calibration (if any)


WORK IS ONGOING..
 
[[WORK IS ONGOING]]

Latest revision as of 17:08, 16 December 2011

All project needs a project folder (physical of electronic) the contents of the documentation may vary depending on the nature of the project. The check list below contains a list of suggested documents.

WORK IS ONGOING..

Project Documentation

  • Project management plan
    • Budget
    • Project plan
    • List of equipment for calibration (if any)


WORK IS ONGOING